Corporate Technology Solutions LLC
Tempe, AZ 85281
Featured Project Return to Projects List
Glbert Public Schools, Campo Verde High School
Project Information
- Project Location:
- Gilbert, AZ
- Status:
- Completed - Jan 2009
- Structure Type:
- Education (K-12)
References
- Owner:
- Gilbert Public Schools
- General Contractor:
- Core Construction
Scope Of Work
Provided and installed a complete in-ceiling cable support system
Provided and installed over (475) work area outlets in 6 buildings. Each outlet consisted of 2 data cables and 1 voice cable
Corporate Technology Solutions built out one main telecommunication closet (MTC) and (5) telecommunication closets (TC). Each telecommunication closet comprised of open frame relay racks, cabinets, grounding systems and cable tray
Provided a large fiber optic backbone cabling system installation which comprised of 12MM 50um and 12 SM optical fiber strands feeding from the MTC to each TC closet
Provided and installed (1) 100pr PE 89 from the MTC room to each TC room
Provided and installed a coaxial CATV system including a .500 osp coax backbone, TV locations, and head-end room build-outs