Prime Cut Construction LLC

Battle Ground, WA 98604

Company Info

  • Est. 2003
  • Annual Vol Undisclosed

Featured Project Return to Projects List

Crystal Creek Cable Suspension Bridge

Project Information

Project Location:
WA
Status:
Completed
Structure Type:
Bridge

References

Client:
Olympic National Park Service

Scope Of Work

150’ Cable Suspension Bridge located in the ONP. This project was located in a very remote location which was accessible by motorized vehicle to only one side. Very challenging site due to near vertical topography. Use of a “high line” was needed to move excavator, material and supplies to far side of bridge to complete project. All structural steel was A588.

Project Images

#
#
#
#
#
#
#
#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/1634733/prime-cut-construction-llc/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.