Logo

Allterrain Paving & Construction LLC

New Albany, IN 47150

Company Info

  • Est. 2016
  • Size 20-49 Employees
  • Annual Vol $6 million - $10 million
  • DUNS # 080109880

Featured Project Return to Projects List

Town of Clarksville - Progress Way

Project Information

Project Location:
IN
Approx Contract:
$5,000
Status:
Completed - Jun 2017
Structure Type:
Road / Highway

References

Architect:
Bradley Cummings- Public Works Director
General Contractor:
APC
Client:
Town of Clarksville

Scope Of Work

For this project we were sent in to fix the uneven and rough transition concerning where the roadway and the bridge meet. This transition had sunken over time which caused the roadway to be uncomfortable and unsafe for drivers. We were able to complete repairs on both ends of the bridge in 1 day causing minimal disruption to traffic flow on this busy roadway. For this project we used our Infrared Asphalt Recycler Machine, therefore there was no need of milling. With this technology we heated the existing asphalt back up to factory standards, and then we add rejuvenating oil, which brought the asphalt back to life. At this point we were able to rake the asphalt to properly distribute it, and at that time the asphalt is rolled and sealed to create a smooth and long lasting surface.

Project Images

#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/1616303/allterrain-paving-construction-llc/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.