Project Information
- Project Location:
- Manhattan, NY
- Approx Contract:
- $20,000
- Status:
- Completed - Jan 2019
- Structure Type:
- Hotel / Motel
References
- General Contractor:
- All Seasons Global Solutions
Scope Of Work
The customer wanted a colored structural concrete walkway and patio for the entryway to the hotel. They needed it to match the interior floor pattern design which was a 2' by 4' porcelain tile. We provided them with a beautiful weathered tin slab, with control joints every 2' by 4' to achieve the design and look they wanted. The slab needed to be poured in two sections to allow continuous traffic in and and out of the hotel because this was the only entrance.
Overall the client loved the color and design on their new concrete slab.