Logo

South Coast Helix Foundations, Inc.

Boerne, TX 78015

Company Info

  • Est. 2002
  • Size 1-4 Employees
  • Annual Vol Undisclosed

Featured Project Return to Projects List

U.S. Coast Guard New Foundation

Project Information

Project Location:
Freeport, TX
Status:
Completed
Structure Type:
Military

Scope Of Work

Structural Engineer: U.S. Coast Guard
General Contractor: Jacquet Construction Services, LLC
Helix Steel Pier Contractor: South Coast Helix Foundations, Inc.
 

Dixie Anchoring System Steel Piers were installed to support a new foundation system. The project consisted of installing a new foundation below an existing building with only twelve (12) feet of vertical clearance. South Coast Helix Foundations, Inc. installed twenty (20) helix steel piers each to carry a 12,000 lb load required by the U.S Coast Guard Engineer. Each helix steel pier was a 1 ½" x 1 ½" rounded corner solid square steel shaft with a triple lead section consisting of an 8", 10" & 12" diameter bearing plates. The helix steel piers were advanced to depths of twenty-seven (27) and thirty-two (32) feet. The top attachment bracket for new construction (plate series) was then bolted to the top of the helix steel piers. The project was completed in two (2) days!

Project Images

#
#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/1606294/south-coast-helix-foundations-inc/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.