South Coast Helix Foundations, Inc.
Boerne, TX 78015
Featured Project Return to Projects List
Jefferson HS Technology Renovations - SAISD
Project Information
- Project Location:
- San Antonio, TX
- Status:
- Completed
- Structure Type:
- Education (K-12)
Scope Of Work
Structural Engineer: Robert Barrera, P.E., Jaster-Quintanilla San Antonio, LLP
General Contractor: Browning Construction Co.
Helix Steel Pier Contractor: South Coast Helix Foundations, Inc.
Project:
Dixie Anchoring System Helix Steel Piers were installed using portable hand-held equipment to support a new concrete ramp and walkway between two (2) existing buildings with limited access. South Coast Helix Foundations, Inc. installed thirteen (13) helix steel piers each carrying either 15,000 or 21,000 lb loads. Each helix steel pier was a 1 ½" x 1 ½" rounded corner solid square steel shaft with a double lead section consisting of an 8" & 10" diameter bearing plates. These helix steel piers were advanced to depths of fifteen (15) and twenty (20) feet. The top attachments, for new construction (plate series), was then bolted to the top of the helix steel piers and will be cast into concrete for this new access.