Logo

Preload

Woburn, MA 01801

Company Info

  • Est. 1930
  • Size 100-249 Employees
  • Annual Vol Undisclosed

Featured Project Return to Projects List

Town of Hudson

Project Information

Project Location:
Hudson, NM
Status:
Completed
Structure Type:
Sewage / Water Treatment Plant

References

Owner:
Town of Hudson

Scope Of Work

Construction Date 2006

Application Water Storage

Capacity 0.945MG (49’ ID x 67’ SWD)

Owner Town of Hudson

Consulting Engineer Weston & Sampson Engineers, Inc., Portsmouth, NH

The Town of Hudson is located on the border of Massachusetts and serves as a commuter town for the Greater Boston area. The town has been growing in recent years due to increasing employment opportunities in Boston. In response to this growth, the Town hired Weston & Sampson Engineers, Inc., Portsmouth, NH, to address additional water storage needs. After researching available alternatives and their costs and benefits, the project team specified an AWWA D110 Type III wire-wound prestressed concrete tank due to its proven cold climate performance and low maintenance requirements. Preload, a recognized innovator in the concrete tank industry, was selected as the preferred tank builder.

Built in 2006, this 945,000 gallon prestressed concrete standpipe has an inside diameter of 49’ and a side water depth of 67’. Its free-span concrete dome is designed to support the heavy snow loads experienced in this region of the country. With its durability and reliability, this Preload prestressed concrete tank will serve Hudson for many decades to come.

Share URL copied!
https://www.thebluebook.com/iProView/1560941/preload/subcontractors/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.