Preload
Woburn, MA 01801
Featured Project Return to Projects List
City of Rio Rancho
Project Information
- Project Location:
- Rio Rancho, NM
- Status:
- Completed
- Structure Type:
- Sewage / Water Treatment Plant
Scope Of Work
Construction Date 2016
Application Reclaimed Water Tank
Capacity 2.0 MG (113' ID x 26.60' SWD)
Owner City of Rio Rancho, NM
Consulting Engineer Huitt-Zollars Inc
The aquifer injection and purified water project includes this two-million-gallon concrete tank for storing untreated water and a building equipped with advanced water treatment equipment to clean the water which will then be pumped into the City’s aquifer.
The project is the first of its kind in New Mexico.
Preload, LLC is proud to be a part of such an outstanding, groundbreaking water reuse program!