Miller Big Picture
Project Information
- Project Location:
- OR
- Status:
- Completed - Aug 2019
- Structure Type:
- School / College / University
Scope Of Work
Caliber’s primary work for this project consisted of voluntary seismic upgrades, re-piping the entire plumbing system, and HVAC replacements. Housed in what is familiarly known as the Miller West building, Hillsboro Big Picture School was in need of safety and HVAC upgrades, including direct digital controls for the HVAC. The old boiler was removed. According to Laurie Lux, the school office manager, the boiler was repurposed from a WWII ship when the school was built in 1948. In its place a , smaller, and more efficient boiler unit was installed. The old galvanized domestic water pipe was also replaced and updated with water piping.