Logo

Yates Construction

Share

Jackson, MS 39202

Company Info

  • Est. 1964
  • Size 500+ Employees
  • Annual Vol Undisclosed

Featured Project Return to Projects List

Semi-Submersible Barge System

Project Information

Project Location:
Biloxi, MS
Status:
Completed
Structure Type:
Marine

References

Owner:
MGM Mirage

Scope Of Work

Yates Construction built the Beau Rivage hotel casino complex, which included construction of five barges that support a 150,000 SF floating facility with a parking garage and marina. Marine construction included 1,400 linear feet of sheet pile wall with an H-pile tie-back flood-wall and concrete cap, a 1,000-foot relieving platform, and the casino itself, built on a semi-submersible configuration.  The sea-anchored, semi-submersible barge system is the largest of its kind. Five custom-fabricated barges – each 100 feet wide by 300 feet long and 10 feet deep – are anchored by steel pipe piles that run 110 feet deep into the Mississippi Sound. Onshore construction work included installation of approximately 900 drill shaft displacement piles (each 18 inches in diameter and 110 feet long), and 1,700 drill shaft displacement piles (each 14 inches in diameter and 40 feet long). Yates also placed 140,000 cubic yards of reinforced structural and flat-work concrete, and constructed a 15-megawatt diesel backup generating plant in the central plant area with automatic switchgear interfaced with the constant power source.

Project Images

#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/1524049/yates-construction/general-contractors/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.