CNN Electrical Contractors LLC
Union, NJ 07083
Featured Project Return to Projects List
Brick Water Treatment Facility
Project Information
- Project Location:
- Brick, NJ
- Status:
- Completed - Jan 2018
- Structure Type:
- Utilities
Scope Of Work
Backup generator 3000 amp, 2 duct banks 300 ft., 600 mcm cable, 1000 mcm cable, 350 mcm cable, 250 mcm cable, installed disconnect 400 amp, switchgear & mcc installation.