Flying Food Group - HVAC/R
Project Information
- Project Location:
- Newark, NJ
- Approx Contract:
- $200,000
- Status:
- Completed - Aug 2017
- Structure Type:
- Manufacturing Plant
References
- Owner:
- Flying Food Group
- General Contractor:
-
Vault Design, Inc.
- Client:
- Roman Perez - Project Manager Vault Design Incorporated
Scope Of Work
Installation of 6 Roof Top Units as follow:
- Cafeteria RTUs 1A, 1B and 1C
Three 5 Ton Rtu, Gas/Electric, 460/3ph, Installation, thermostat, ductwork, supply and return register per plans specification.
Note: Electrical Power and Nat. Gas by other.
- Mezzanine RTU 2
One 10 Ton RTU, Gas/Electric, 460/3ph, Installation, thermostat, ductwork, supply and return register per plans specification.
Note: Electrical Power and Nat. Gas by other.
- Mezzanine RTU 3
One 6 Ton RTU, Gas/Electric, 460/3ph, Installation, thermostat, ductwork, supply and return register per plans specification.
Note: Electrical Power and Nat. Gas by other.
- Mezzanine RTU 4
One 3 Ton RTU, Gas/Electric, 460/3ph, Installation, thermostat, ductwork, supply and return register per plans specification.
Note: Electrical Power and Nat. Gas by other.
- Mini Split ACC 1
24k btu, HP, 208-230, Wall Mnt, 17.5 seer System (includes Condenser, Wall mount Evap. blower, Line set, communication wire, wire and wireless thermostat + full installation) per plans specification. more
Refrigeration Scope:
1.-Supply and run refrigeration Line for 3 Walk-in Cooler
2.-Supply and install expansion valves on 5 already hung Evaporator blower.
3.-Supply and Install Temp. Control and Solenoid valve on each Walk-in cooler.
4.-Charge them with R404A 5.-Startup units
Refrigeration install for a condensing unit Krack m# CSD-250M4M with 2 blower Krack m# SM26A-915-CM
1.-Line set by us
2.-Temperature control by us
3.-Solenoid Valve by us
4.-Expansion Valve by us
5.-Evacuate to 500 microns.
6.-Charge unit with R404A
7.- Power to Condenser and Blower by other
Refrigeration install for a condensing unit Krack m# HTSD-1500MSM with 2 blower Krack m# MS36A-626CM
1.-Line set by us
2.-Temperature control by us
3.-Solenoid Valve by us
4.-Expansion Valve by us
5.-Evacuate to 500 microns.
6.-Charge unit with R404A
7.- Power to Condenser and Blower by other
Refrigeration install for a condensing unit Krack m# HTSZ-1000MSM with a blower Krack m# SM26A-915-CM
1.-Line set by us
2.-Temperature control by us
3.-Solenoid Valve by us
4.-Expansion Valve by us
5.-Evacuate to 500 microns.
6.-Charge unit with R404A
7.- Power to Condenser and Blower by other