David Nelson Construction Co.
Palm Harbor, FL 34683
Featured Project Return to Projects List
Remote Parking Lot Expansion – St. Pete-Clearwater International Airport
Project Information
- Project Location:
- Pinellas County, FL
- Status:
- Completed - Dec 2016
- Structure Type:
- Terminal - Airport / Bus / Railroad
References
- Owner:
- Pinellas County
- Architect:
- Jacobs Engineering
- General Contractor:
- Self-Performed (David Nelson Construction Co.)
Scope Of Work
In order to expand its parking capacity, Pinellas County contracted with DNCC to construct a new overflow parking lot across the street from the airport and next to it’s existing overflow parking lot. Included in our scope was seal coating and restriping the existing parking lot for 521 parking spaces. With the new lot the total parking capacity was increased to 1,078 parking spaces. The new parking lot was completed within the contract time of 150 days in order to make the holiday parking crunch.
Some of the major elements in our contract included a new pond with 24,500 CY of excavation. The new pond side slopes were lined with 3,000 SY of 8” filter point fabric-formed concrete revetment mat. Also included in our scope was 23,000 SY of crushed concrete base with asphalt paving, 1,315 Lf of storm drainage, new fencing and automatic entry gates, four remote call box stations, site lighting, and four passenger shelters. At the completion of this project we negotiated a change order to add an addition remote parking area using 6 inches of recycled asphalt paving which was left over from a separate runway milling project. This added 493 additional parking spaces to the project.