Logo

Nash CM, Inc.

Plano, TX 75074

Company Info

  • Annual Vol Undisclosed

People Also View These
Loading...

Our Story

Our main lines of business include: Concrete Contrs.--Sidewalks/Floors/Flat, Framing Systems--Light Gauge, Landscape Construction, Roofing Contractors, Soil Erosion Control, Underground Utilities--Contractors.

Nash CM, Inc. has been listed in the Blue Book since 2016.

What We Do

Regions & Counties Serviced

  • Dallas, Fort Worth

Texas 1

  • Collin

Our CSI Codes

01 24 13 - Value Engineering
01 29 83 - Payment Procedures for Testing Laboratory Services
01 31 13 - Project Coordination
01 31 19.13 - Preconstruction Meetings
01 35 16 - Alteration Project Procedures
01 57 13 - Temporary Erosion and Sediment Control
01 84 19 - Interior Finishes Performance Requirements
01 85 00.00.01 - Conveying Equipment Performance Requirements
01 87 13 - Equipment Performance Requirements
01 88 16 - Selective Construction Performance Requirements
01 91 23 - Interiors Commissioning
01 91 23.13 - Interior Construction Commissioning
01 91 23.43 - Stairways Commissioning
02 05 19 - Geosynthetics for Existing Conditions
02 05 19.13 - Geotextiles for Existing Conditions
02 05 19.16 - Geomembranes for Existing Conditions
02 05 19.19 - Geogrids for Existing Conditions
02 58 13 - Snow Fencing
03 08 00.00.01 - Commissioning of Concrete
03 11 13.13 - Concrete Slip Forming
03 35 23 - Exposed Aggregate Concrete Finishing
03 35 26 - Grooved Concrete Surface Finishing
04 08 00.00.01 - Commissioning of Masonry
05 01 40 - Maintenance of Cold-Formed Metal Framing
05 06 40 - Schedules for Cold-Formed Metal Framing
05 10 00.00.01 - Structural Metal Framing
05 12 13 - Architecturally-Exposed Structural Steel Framing
05 13 00.00.01 - Structural Stainless-Steel Framing
05 14 13 - Architecturally-Exposed Structural Aluminum Framing
05 40 00.00.01 - Cold-Formed Metal Framing
05 41 00.00.01 - Structural Metal Stud Framing
05 43 00.00.01 - Slotted Channel Framing
05 45 13 - Mechanical Metal Supports
05 45 23 - Healthcare Metal Supports
07 01 30 - Maintenance of Steep Slope Roofing
07 01 50 - Maintenance of Membrane Roofing
07 01 50.23 - Roof Removal
07 01 50.61 - Roof Re-Coating
07 01 50.81 - Roof Replacement
07 01 50.91 - Roofing Restoration
07 06 30 - Schedules for Steep Slope Roofing
07 06 50 - Schedules for Membrane Roofing
07 57 13 - Sprayed Polyurethane Foam Roofing
09 22 16 - Non-Structural Metal Framing
09 22 16.13 - Non-Structural Metal Stud Framing
23 22 13.13 - Underground Steam and Condensate Heating Piping
26 05 43 - Underground Ducts and Raceways for Electrical Systems
31 05 19 - Geosynthetics for Earthwork
31 05 19.13 - Geotextiles for Earthwork
31 05 19.16 - Geomembranes for Earthwork
31 05 19.19 - Geogrids for Earthwork
31 21 16.13 - Methane Venting
31 25 13 - Erosion Controls
31 25 23 - Rock Barriers
31 25 53 - Sedimentation Controls
31 25 63 - Rock Basins
31 31 19 - Vegetation Control
31 31 19.13 - Chemical Vegetation Control
31 32 19.19 - Geogrid Layer Separation
31 32 19.23 - Geotextile Layer Separation
31 34 19 - Geosynthetic Soil Reinforcement
31 34 19.13 - Geogrid Soil Reinforcement
31 34 19.16 - Geotextile Soil Reinforcement
31 34 23 - Fiber Soil Reinforcement
31 34 23.13 - Geosynthetic Fiber Soil Reinforcement
31 35 23.19 - Concrete Unit Masonry Slope Paving
31 37 13 - Machined Riprap
31 37 16 - Non-Machined Riprap
31 37 16.16 - Concrete Unit Masonry Riprap
31 37 16.19 - Sacked Sand-Cement Riprap
32 01 90 - Operation and Maintenance of Planting
32 01 90.13 - Fertilizing
32 01 90.16 - Amending Soils
32 01 90.19 - Mowing
32 01 90.23 - Pruning
32 01 90.26 - Watering
32 01 90.29 - Topsoil Preservation
32 01 90.33 - Tree and Shrub Preservation
32 05 33 - Common Work Results for Planting
32 06 90 - Schedules for Planting
32 06 90.13 - Planting Schedule
32 16 13.13 - Cast-In-Place Concrete Curbs and Gutters
32 16 13.16 - Cast-In-Place Concrete Curbs
32 16 13.19 - Cast-In-Place Concrete Gutters
32 18 23.13 - Baseball Field Surfacing
32 18 23.16 - Natural Baseball Field Surfacing
32 18 23.26 - Natural Field Sport Surfacing
32 90 00.00.01 - Planting
32 91 13 - Soil Preparation
32 91 13.13 - Hydro-Punching
32 91 13.16 - Mulching
32 91 13.19 - Planting Soil Mixing
32 91 13.23 - Structural Soil Mixing
32 91 13.26 - Planting Beds
32 92 13 - Hydro-Mulching
32 92 16 - Plugging
32 92 19 - Seeding
32 92 19.13 - Mechanical Seeding
32 92 19.16 - Hydraulic Seeding
32 92 23 - Sodding
32 92 26 - Sprigging
32 92 26.13 - Stolonizing
32 96 13 - Ground Cover Transplanting
32 96 23 - Plant and Bulb Transplanting
33 01 60 - Operation and Maintenance of Hydronic and Steam Energy Utilities
33 01 70 - Operation and Maintenance of Electrical Utilities
33 01 80 - Operation and Maintenance of Communications Utilities
33 06 10 - Schedules for Water Utilities
33 06 40 - Schedules for Storm Drainage Utilities
33 06 60 - Schedules for Hydronic and Steam Energy Utilities
33 06 70 - Schedules for Electrical Utilities
33 09 40 - Instrumentation and Control for Storm Drainage Utilities
33 09 60 - Instrumentation and Control for Hydronic and Steam Energy Utilities
33 09 70 - Instrumentation and Control for Electrical Utilities
33 11 16 - Site Water Utility Distribution Piping
33 29 00.00.01 - Well Abandonment
33 33 13 - Sanitary Utility Sewerage
33 33 16 - Combined Utility Sewerage
33 34 13 - Sanitary Utility Sewerage Inverted Siphons
33 41 13 - Public Storm Utility Drainage Piping
33 46 19.16 - Geocomposite Underslab Drainage
33 46 23.19 - Geosynthetic Drainage Layers
33 46 26 - Geotextile Subsurface Drainage Filtration
33 46 33 - Retaining Wall Drainage
33 50 00.00.01 - Fuel Distribution Utilities
33 51 13 - Natural-Gas Piping
33 60 00.00.01 - Hydronic and Steam Energy Utilities
33 61 13 - Underground Hydronic Energy Distribution
33 61 23 - Aboveground Hydronic Energy Distribution
33 63 13 - Underground Steam and Condensate Distribution Piping
33 70 00.00.01 - Electrical Utilities
33 71 19 - Electrical Underground Ducts and Manholes
33 71 39.23 - Underground High-Voltage Wiring
33 71 49.23 - Underground Medium-Voltage Wiring
33 79 19 - Utilities Grounding
33 79 19.13 - Electrical Utilities Grounding
33 79 19.16 - Communications Utilities Grounding
34 82 19 - Bridge Pier Protection
35 31 29.40 - Stone Groins
35 42 29 - Grout-Bag Bank Protection
35 42 34 - Soil Reinforcement Bank Protection
35 43 29 - Grout-Bag Scour Protection
35 43 34 - Soil Reinforcement Scour Protection
40 23 36 - Sanitary Water Process Piping

Project Experience

  • Service Work/Repairs

Gallery

Featured Image 1
Recent Projects
Featured Image 2
Recent Projects
Featured Image 3
Recent Projects
Featured Image 4
Recent Projects

Associations & Memberships

SBE (Small Business Enterprise)
SBE (Small Business Enterprise)
Share URL copied!
https://www.thebluebook.com/iProView/1477211/nash-cm-inc/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.