University of Alaska Powerhouse Project

Project Information

Project Location:
Fairbanks, AL
Status:
Completed
Structure Type:
Power Generation & Distribution

Scope Of Work

Project:University of Alaska Fairbanks Powerhouse
 
Installation Criteria:
Drilled/Cased 24″ & 18″ piles
  
Equipment:Cat 349 and HD70
 
Installation Depths:
10′ to 25′
 
Jobsite Restrictions:
Within 2′ of buildings, water mains, narrow access roads
 
Geotechnical Concerns:


High ground water, soil settlement

APE supplied:
Built Custom Drill Tooling used to install and clear Piles
 
Time to Install single unit:
10 min to install casing and clear cuttings
simaltainiously
 
APE job influence:
Designed Drilling system to install and clear the piles with APE equipment
  
 
DescriptionCruz Construction recently purchased a HD70 drill to be used on a powerhouse retrofit project for the UAF in Fairbanks, AK. Project was latent with tight work areas, underground interferences and ground disruption concerns.
 APE Designed a casing driver that was used to lock into the top of each pile, inside the casing driver a connection was built to connect a wide variety of drill tooling which can clear the pile as it is advanced.
 Cruz used the HD system to install 24″ and 18′ casing from depths of 10′ to 25′, all while mitigating job site concerns and hazards.

Project Images

#
#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/1456223/pileworks/manufacturers/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.