Logo

Pileworks

Magnolia, TX 77355

Company Info

  • Est. 2014
  • Size 20-49 Employees

Featured Project Return to Projects List

Museum Expansion Project (Low-Overhead)

Project Information

Project Location:
Anchorage, AL
Status:
Completed
Structure Type:
Museum

Scope Of Work

Project:Anchorage museum expansion
 
Installation Criteria:Groute 5.5″ HD steel pile
 
Project Lead:Ben Cruz
 
Equipment:Cat 299 and HD50 Low Head room
 
Installation Depths:10′ to 25′
 
Jobsite RestrictionsWithin 2″ of buildings and walls, narrow access ways and low head room

Geotechnical Concerns:
 

ground water, soil settlement, dense layers sitting on top of weaker soils
APE supplied:Built Custom Drill Tooling used to install grouted piles.
 
Time to Install single unit:
 

7-10 minutes to install each pile.
APE job influence:Designed Drilling system to install and grout piles simultaneously
  
 
Description:Ape presented the only option to deliver a high capacity pile while working with less than 10′ of height.

Project Images

#
#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/1456223/pileworks/manufacturers/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.