Pileworks
Magnolia, TX 77355
Featured Project Return to Projects List
Oil Tank Farm Powersystem Foundations
Project Information
- Project Location:
- Galveston, TX
- Status:
- Completed
- Structure Type:
- Power Generation & Distribution
Scope Of Work
Project |
Galveston TX Oil Tank Farm Powersystem Foundations |
Installation Criteria: | 4.5″ pressure grouted HD Micropile 25ft & 5.5″ Pressure grouted HD Micropile 55ft |
Project Lead: | Tim Johnston |
Equipment: | Cat 349 with a HD150 & Komatsu 490 with a HD70 |
Installation Depths: | 25ft and 55 |
Jobsite Restrictions: | Superfund site. Piles cannot create a pathway between contamination and clean water aquifirs. Tower loading – tension and compression |
Geotechnical Concerns: | High ground water, clay rich soils |
APE supplied: | Tools, materials and engineering and testing support |
Time to Install single unit: | 8-15 min 25ft 4.5″ Pressure Grouted pile 25 min 55ft 5.5″ pressure grouted pile |
APE job influence: | APE added its new thread on cap for this project and directed load testing and design. |
Description: | The EPA controlled the process of pile selection, the process for pile approval was stalling the job. The APE Pressure Grouted HD Micropile gave the EPA the pile they needed to protect the clean water aquifirs from the contaminated soils above. Approval of the HD pile moved the project forward. APE provided engineering and load testing support to complete the design of towers and cable tray racks. APE used its new thread on pile cap to eliminate onsite welding from the pile process. |