Logo

Absolute Grass, Inc.

Mentor, OH 44060

Company Info

  • Annual Vol Not Provided

People Also View These
Loading...

Our Story

Your Environmental Project is always in good hands with our team. In the process, we always keep your personal wishes and needs in mind. See for yourself just how professional and creative our work is!

What makes us different - Planning, implementation and maintenance. Utilizing renewable and sustainable practices we can design the proper environmental solution for your project . You can count on our experts with many years of experience, great ideas and wide-ranging expertise. Our scope of services is very broad and includes residential, commercial and public works.

What We Do

Regions & Counties Serviced

  • Cleveland - Northeastern Ohio

Ohio All

Pennsylvania 11

  • Allegheny
  • Beaver
  • Butler
  • Crawford
  • Erie
  • Forest
  • Lawrence
  • Mercer
  • Venango
  • Warren
  • Washington

Our CSI Codes

01 57 13 - Temporary Erosion and Sediment Control
01 57 23 - Temporary Storm Water Pollution Control
02 05 19 - Geosynthetics for Existing Conditions
02 05 19.13 - Geotextiles for Existing Conditions
02 05 19.16 - Geomembranes for Existing Conditions
02 05 19.19 - Geogrids for Existing Conditions
02 58 13 - Snow Fencing
06 01 20 - Maintenance of Finish Carpentry
06 06 20 - Schedules for Finish Carpentry
06 06 40 - Schedules for Architectural Woodwork
06 20 23 - Interior Finish Carpentry
06 40 23 - Interior Architectural Woodwork
06 41 16 - Plastic-Laminate-Clad Architectural Cabinets
06 66 00.00.01 - Custom Ornamental Simulated Woodwork
12 01 30 - Operation and Maintenance of Casework
12 06 30 - Schedules for Casework
12 30 00.00.01 - Casework
12 31 16 - Manufactured Metal Sandwich Panel Casework
12 32 13 - Manufactured Wood-Veneer-Faced Casework
12 32 16 - Manufactured Plastic-Laminate-Clad Casework
12 34 16 - Manufactured Solid-Plastic Casework
12 35 17 - Bank Casework
12 35 25 - Hospitality Casework
12 35 30 - Residential Casework
12 35 30.43 - Dormitory Casework
12 35 33 - Utility Room Casework
12 35 50.13 - Educational Casework
12 35 70.16 - Nurse Station Casework
12 35 70.74 - Dental Casework
12 58 26 - Entertainment Centers
31 05 19 - Geosynthetics for Earthwork
31 05 19.13 - Geotextiles for Earthwork
31 05 19.16 - Geomembranes for Earthwork
31 05 19.19 - Geogrids for Earthwork
31 25 13 - Erosion Controls
31 25 23 - Rock Barriers
31 25 53 - Sedimentation Controls
31 25 63 - Rock Basins
31 31 19 - Vegetation Control
31 31 19.13 - Chemical Vegetation Control
31 32 19.19 - Geogrid Layer Separation
31 32 19.23 - Geotextile Layer Separation
31 34 19 - Geosynthetic Soil Reinforcement
31 34 19.13 - Geogrid Soil Reinforcement
31 34 19.16 - Geotextile Soil Reinforcement
31 34 23 - Fiber Soil Reinforcement
31 34 23.13 - Geosynthetic Fiber Soil Reinforcement
31 35 23.19 - Concrete Unit Masonry Slope Paving
31 37 13 - Machined Riprap
31 37 16 - Non-Machined Riprap
31 37 16.16 - Concrete Unit Masonry Riprap
31 37 16.19 - Sacked Sand-Cement Riprap
32 01 90 - Operation and Maintenance of Planting
32 01 90.13 - Fertilizing
32 01 90.16 - Amending Soils
32 01 90.19 - Mowing
32 01 90.23 - Pruning
32 01 90.26 - Watering
32 01 90.29 - Topsoil Preservation
32 01 90.33 - Tree and Shrub Preservation
32 05 33 - Common Work Results for Planting
32 06 90 - Schedules for Planting
32 06 90.13 - Planting Schedule
32 18 23.13 - Baseball Field Surfacing
32 18 23.16 - Natural Baseball Field Surfacing
32 18 23.26 - Natural Field Sport Surfacing
32 90 00.00.01 - Planting
32 91 13 - Soil Preparation
32 91 13.13 - Hydro-Punching
32 91 13.16 - Mulching
32 91 13.19 - Planting Soil Mixing
32 91 13.23 - Structural Soil Mixing
32 91 13.26 - Planting Beds
32 92 13 - Hydro-Mulching
32 92 16 - Plugging
32 92 19 - Seeding
32 92 19.13 - Mechanical Seeding
32 92 19.16 - Hydraulic Seeding
32 92 23 - Sodding
32 92 26 - Sprigging
32 92 26.13 - Stolonizing
32 96 13 - Ground Cover Transplanting
32 96 23 - Plant and Bulb Transplanting
33 06 40.13 - Storm Drainage Schedule
33 44 19 - Utility Storm Water Treatment
33 44 19.13 - In-Line Utility Storm Water Filters
33 44 19.16 - Catch Basin Insert Utility Storm Water Filters
33 44 19.19 - Utility Oil and Gas Separators
33 46 19.16 - Geocomposite Underslab Drainage
33 46 23.19 - Geosynthetic Drainage Layers
33 46 26 - Geotextile Subsurface Drainage Filtration
33 46 33 - Retaining Wall Drainage
34 82 19 - Bridge Pier Protection
35 31 29.40 - Stone Groins
35 42 29 - Grout-Bag Bank Protection
35 42 34 - Soil Reinforcement Bank Protection
35 43 29 - Grout-Bag Scour Protection
35 43 34 - Soil Reinforcement Scour Protection

Project Experience

  • Service Work/Repairs

Gallery

Featured Image 1
Recent Projects
Featured Image 2
Slope Retention with Flexxterra FGM day 1
Featured Image 3
Recent Projects
Featured Image 4
Slope Retention with Flexxterra 35 days after Seeding

Associations & Memberships

OSHA - 40 Hour Hazardous Materials Technician 29 CFR 1910.12
OSHA - 40 Hour Hazardous Materials Technician 29 CFR 1910.12
Share URL copied!
https://www.thebluebook.com/iProView/1442032/absolute-grass-inc/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.