Greenfield Electric Power Substation
Project Information
- Project Location:
- PA
- Status:
- Completed - Jan 2018
- Structure Type:
- Power Generation & Distribution
Scope Of Work
Below-Grade Construction
Placed 560 cubic yards of concrete for structure and equipment foundations
Installed 13,785 linear feet of 4/0 cu ground-grid
Installed 2,400 linear feet of Rob Roy and concrete encased conduit
Installed 230 feet of precast cable trench
Installed a perimeter fence
Placed 380 cubic yards of stone
Above-Grade Construction
Erected 33,256 pounds of steelĀ
Set and assembled a 69/13.8 kV Xfrmr and control house
Installed 500 linear feet of bus work (3 inch and 5 inch)
Installed electrical P&CĀ
Erected two dead-end structures
Rigged and set 2 - 69/13.8 kV transformer and control houses including matting and access
Installed 1,000 linear feet of rigid tubular 5 inch and 3 feet bus
Set and installed 2 - 115 kV rated circuit breakers and 13.8 kV circuit breakers
Lean, Innovative, and Unique Project Solutions
The project was constructed during the harsh winter months which complicated concrete placements. The team built tents around the foundations to ensure adequate protection of the concrete and to maintain temperatures for proper curing. Additionally, with the quick thaw, the existing site material became challenging for access. The team utilized crane mats and stone pads to install equipment.