Logo

Petroleum Marine Constr.

Fort Lauderdale, FL 33334

Company Info

  • Est. 25
  • Size 5-9 Employees
  • Annual Vol Not Provided

Featured Project Return to Projects List

Marina Palms

Project Information

Project Location:
N Miami, FL
Status:
Completed - Dec 2015
Structure Type:
Marine

References

General Contractor:
Kearns Constructions

Scope Of Work

The Marina Palms Yacht Club & Residences is a nautical enthusiast’s dream, offering marina lifestyle with 468 residences in two towers overlooking a 112 marina with slips up to 90 ft in length.

Provided design, engineering and permitting services as required to prepare complete permit plans with specifications therein to; provide labor, materials, equipment, and supervision to install one (1) 12,000 gallon diesel and one (1) 12,000 gallon gasoline Glasteel II  double wall underground storage tanks for multiple fuel dispensing on a Harbor Master floating fuel dock. Install one (2) 2” gasoline and one (1) 2” diesel double wall product piping from designated storage tank compartments to one (1) upland transition sump. Transition sump contains, SS ball valves, solenoid valves, and breakaway valves. Piping continues  thru seawall, under gangway, and within Harbor Master dock pvc product pipe chases to two (2) Pump Measure Control Commander duel hose dual product dispensers each with 100 ft of hose on stainless steel electric hose reels.

 

Project Images

#
#
Share URL copied!
https://www.thebluebook.com/iProView/1387933/petroleum-marine-constr/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.