Featured Project Return to Projects List
WESD Board of Education 10,000 SF
Project Information
- Project Location:
- Willoughby, OH
- Status:
- Completed
- Structure Type:
- School / College / University
References
- Owner:
- WESD
- Architect:
- Then Design
- General Contractor:
- AE Com
Scope Of Work
10,000 SF 5 story complete tear off / deck replacement. Installed double layer 2.6" insulation and 1/4" HD cover board mechanically attached, a temporary TPO roof was installed for construction on the roof to be completed, temporary roof was removed and a new grey TPO roof was installed over the new insulation.