Granite Construction, Inc.
Watsonville, CA 95077
Featured Project Return to Projects List
Mountain View Corridor, Redwood Road to 9000 South
Project Information
- Project Location:
- Salt Lake City, UT
- Status:
- In-Progress
- Structure Type:
- Road / Highway
References
- Owner:
- Utah Dept of Transportation
- Architect:
- Not Available
- General Contractor:
- Not Available
Scope Of Work
The first phase of construction covers approximately 9 miles of a two-lane road between Redwood and Old Bingham Highway in and around Salt Lake City, with asphalt paved in a frontage road alignment. The second phase of construction contracts 6.5 miles of roadway from Old Bingham Highway North to 5400 South. Overall work includes signalized intersections, recreational trains, drainage improvements, and new structures.