West End Plumbing
Sunrise, FL 33351
Featured Project Return to Projects List
House Re-model
Project Information
- Project Location:
- Coral Springs, FL
- Status:
- Completed - Oct 2018
- Structure Type:
- Residential Building
References
- General Contractor:
- Avalon Construction
Scope Of Work
SCOPE OF WORK:
MASTER BATHROOM: CONNECT CUSTOMER SUPPLIED LAV AND LAV FAUCETS WITH NEW HOT AND COLD ANGLE STOPS. INSTALL CUSTOMER SUPPLIED SHOWER VALVE WITH HAND HELD AND RAIN HEAD (TO BE MOUNTED ON ARM W/A FLAG BAR). TRIM OUT SHOWER, TRIM IS CUSTOMER SUPPLIED. * PIPING OF (2) BODY SPRAYS.
CABANA BATH: FURNISH AND INSTALL (1) CUSTOMER SUPPLIED NEW GERBER ADA 2PC ELONGATED TOILET WITH RIGHT HAND FLUSH. CONNECT CUSTOMER SUPPLIED LAV AND LAV FAUCET WITH NEW HOT AND COLD ANGLE STOPS.
JACK-N-JILL BATHROOM:
CONNECT (2) CUSTOMER SUPPLIED LAV AND LAV FAUCETS WITH NEW HOT AND COLD ANGLE STOPS.
FURNISH AND INSTALL (1) CUSTOMER SUPPLIED NEW GERBER ADA 2PC ELONGATED TOILET WITH NEW ANGEL STOP. FURNISH AND INSTALL NEW PITCH KIT AND SHOWER PAN. INSTALL CUSTOMER SUPPLIED NEW SHOWER VALVE. TRIM OUT SHOWER, TRIM IS CUSTOMER SUPPLIED.
KITCHEN: CONNECT CUSTOMER SUPPLIED KITCHEN SINK, FAUCET, DISHWASHER, WATER FILTER, INSTA-HOT AND GARBAGE DISPOSAL WITH NEW HOT AND COLD ANGLE STOPS. *REBUILD DRAIN ARM AND CLEAN OUT PRIOR TO DRY WALL.
GARAGE: REMOVE AND RE-INSTALL CUSTOMER SUPPLIED WATER HEATER.
OWNER WAS SATISFIED WITH THE COMPLETED PROJECT