Scope Of Work
SCOPE OF WORK:
ROUTE TO EXISTING GREASE WASTE CONNECTION STUBBED INTO SPACE.
ROUTE WASTE TO DISCHARGE INDIRECTLY INTO FLOOR SINK WITH CODE APPROVED AIR GAP.
REINSTALL EXISTING WATER FILTRATION SYSTEM. COLD WATER PIPING DOWN TO WATER FILTER SYSTEM.
FILTERED WATER PIPING TO ICE MACHINE, SODA DISPENSER & DIPPERWELL. PROVIDE BACKFLOW PRIOR TO CONNECTIONS TO EQUIPMENT.
REWORK HOT & COLD WATER FOR THE EXISTING SERVICE SINK.
PROVIDE LAWLER TMM1070 LF AT POINT OF USE MIXING VALVE AT FIXTURE.
ROUTE TO CONNECT TO EXISTING SANITARY VENT.
ROUTE WATER SUPPLIES TO CONNECT TO EXISTING WATER SUPPLIES.
WASTE FROM EXISTING MOP SINK (REROUTE ONLY IF REQUIRED).
ALL UNDERGROUND LINE SHALL BE IN “K” COPPER.
ALL ABOVEGROUND LINES SHALL BE IN “L” COPPER.
INSULATION FOR HOT AND COLD PIPING SHALL BE 1” THICK FIBERGLASS ALL SERVICE JACKET TYPE WRAP.
PROVIDE ALL CHROME-PLATED ESCUTCHEONS ON ALL PIPES.
REINSTALL EXISTING WATER HEATER AS SPECIFIED PER THE WATER HEATER SCHEDULE.
FURNISH AND INSTALL FIXTURES AS PER PLUMBING FIXTURE SCHEDULE.
FURNISH AND INSTALL FIRE STOPPING AT PIPE PENETRATION IN FIRE RATED WALLS, CEILINGS, FLOORS & ROOFS AS REQUIRED.
OWNER WAS SATISFIED WITH THE COMPLETED PROJECT