Five Diamonds Mezzanine

Project Information

Project Location:
Waukesha, WI
Status:
Completed
Structure Type:
Athletic Field

Scope Of Work

The FORTECO Floor Framing was panelized for this project and installed in a fraction of the time it takes to install standard structural steel framing   This 43,000 sq. st. building was designed and engineered by Jendusa Design & Engineering , the engineering company owned by the Founder of Forteco Framing Co.

FORTECO Lightweight Composite Floor Framing System for 2nd floor of 5 Diamonds Mezzanine Sports Facility

 

FORTECO framing used fully engineered, assembles panels. The panels can be individually handled and placed in position. This made the construction much simpler.

FORTECO Lightweight Composite Framing | Assembled Frames Provide Modular Solution for Construction | FORTECO Frames Can be Fully Assembled and Delivered to the Construction Site

 

FORTECO frames are light weight. The metal studs were enough to bear the frame. This is an advantage for constructing floors using FORTECO, as there is no requirement to build an extensive load bearing structure.

FORTECO Frames Are Light Weight Minimizing Requirements for Extensive Support Structure

Project Images

#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/1153201/forteco-framing-company/material-suppliers/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.