Parrot Structural Services LLC

Calera, AL 35040

Company Info

  • Annual Vol $1 million - $3 million

People Also View These
Loading...

Our Story

Our main lines of business include: Concrete Repair & Restoration Contrs., Grouting--Pressure, M.W.B.E.--Concrete Contractors, Mud Jacking & Slab Jacking, Soil Stabilization, Underpinning Contractors.

Parrot Structural Services LLC has been listed in the Blue Book since 2010.

What We Do

  • Concrete Repair & Restoration Contrs.
  • Foundation Contractors--Geotechnical
  • Grouting--Pressure
  • M.W.B.E.--Concrete Contractors
  • Mud Jacking & Slab Jacking
  • Soil Stabilization
  • Underpinning Contractors

Regions & Counties Serviced

  • Alabama

Alabama 1

  • Shelby

Our CSI Codes

02 06 30.13 - Boring or Test Pit Log Schedule
02 57 13 - Sinkhole Remediation by Grouting
02 57 13.13 - Sinkhole Remediation by Compaction Grouting
02 57 13.16 - Sinkhole Remediation by Cap Grouting
03 01 70 - Maintenance of Mass Concrete
03 06 60 - Schedules for Grouting
03 06 70 - Schedules for Mass Concrete
03 47 16 - Lift-Slab Concrete
03 61 13 - Dry-Pack Grouting
03 62 13 - Non-Metallic Non-Shrink Grouting
03 62 16 - Metallic Non-Shrink Grouting
03 64 23 - Epoxy Injection Grouting
03 70 00.00.01 - Mass Concrete
03 71 00.00.01 - Mass Concrete for Raft Foundations
03 72 00.00.01 - Mass Concrete for Dams
06 01 80.51 - Composite Cleaning
06 01 80.91 - Composite Restoration
31 01 40 - Maintenance of Shoring and Underpinning
31 06 40 - Schedules for Shoring and Underpinning
31 24 13 - Roadway Embankments
31 24 16 - Railway Embankments
31 32 13 - Soil Mixing Stabilization
31 32 13.13 - Asphalt Soil Stabilization
31 32 13.16 - Cement Soil Stabilization
31 32 13.19 - Lime Soil Stabilization
31 32 13.23 - Fly-Ash Soil Stabilization
31 32 13.26 - Lime-Fly-Ash Soil Stabilization
31 32 16 - Chemical Treatment Soil Stabilization
31 32 16.13 - Polymer Emulsion Soil Stabilization
31 32 19 - Geosynthetic Soil Stabilization and Layer Separation
31 32 19.13 - Geogrid Soil Stabilization
31 32 19.16 - Geotextile Soil Stabilization
31 32 23 - Pressure Grouting Soil Stabilization
31 32 23.13 - Cementitious Pressure Grouting Soil Stabilization
31 32 23.16 - Chemical Pressure Grouting Soil Stabilization
31 32 33 - Shotcrete Soil Slope Stabilization
31 32 36.16 - Grouted Soil Nailing
31 32 36.23 - Jet-Grouted Soil Nailing
31 32 36.26 - Launched Soil Nailing
31 33 13 - Rock Bolting and Grouting
31 33 23 - Rock Slope Netting
31 33 26 - Rock Slope Wire Mesh
31 33 43 - Vegetated Rock Slope Stabilization
31 35 19 - Geosynthetic Slope Protection
31 35 19.13 - Geogrid Slope Protection
31 35 19.16 - Geotextile Slope Protection
31 35 19.19 - Slope Protection with Mulch Control Netting
31 35 23 - Slope Protection with Slope Paving
31 35 23.13 - Cast-In-Place Concrete Slope Paving
31 35 26 - Containment Barriers
31 35 26.13 - Clay Containment Barriers
31 35 26.16 - Geomembrane Containment Barriers
31 35 26.23 - Bentonite Slurry Trench
31 40 00.00.01 - Shoring and Underpinning
31 43 13 - Pressure Grouting
31 43 13.13 - Concrete Pressure Grouting
31 43 13.16 - Polyurethane Pressure Grouting
31 43 16 - Compaction Grouting
31 43 19 - Mechanical Jacking
31 48 13 - Underpinning Piers
31 48 23 - Jacked Piers
31 48 33 - Micropile Underpinning
31 53 13 - Timber Cribwork
31 62 13.26 - Pressure-Injected Footings
31 72 13 - Rock Reinforcement and Initial Support
31 73 13 - Cement Tunnel Grouting
31 73 16 - Chemical Tunnel Grouting
32 06 30.13 - Retaining Wall Schedule
32 11 33 - Cement-Treated Base Courses
32 32 13 - Cast-in-Place Concrete Retaining Walls
32 32 16 - Precast Concrete Retaining Walls
32 32 19 - Unit Masonry Retaining Walls
32 32 23 - Segmental Retaining Walls
32 32 23.13 - Segmental Concrete Unit Masonry Retaining Walls
32 32 26 - Metal Crib Retaining Walls
32 32 29 - Timber Retaining Walls
32 32 34 - Reinforced Soil Retaining Walls
32 32 36 - Gabion Retaining Walls
32 32 43 - Soldier-Beam Retaining Walls
32 91 16 - Planting Soil Stabilization
32 91 16.13 - Blanket Planting Soil Stabilization
32 91 16.16 - Mat Planting Soil Stabilization
32 91 16.19 - Netting Planting Soil Stabilization
33 05 23 - Trenchless Utility Installation
33 05 23.13 - Utility Horizontal Directional Drilling
33 05 23.16 - Utility Pipe Jacking
33 05 23.19 - Microtunneling
33 05 23.23 - Utility Pipe Ramming
33 05 23.26 - Utility Impact Moling
33 05 23.29 - Cable Trenching and Plowing
33 06 80 - Schedules for Communications Utilities
33 09 80 - Instrumentation and Control for Communications Utilities
35 31 16.16 - Segmental Seawalls
35 41 13 - Landside Levee Berms
35 41 13.13 - Stability Landside Levee Berms
35 41 13.16 - Seepage Landside Levee Berms
35 42 35 - Slope Protection Bank Protection
35 42 53.16 - Concrete Unit Masonry Wall Bank Protection
35 42 53.19 - Segmental Wall Bank Protection
35 42 53.40 - Stone Wall Bank Protection
35 43 35 - Slope Protection Scour Protection
35 43 53 - Wall Scour Protection
35 43 53.13 - Concrete Unit Masonry Wall Scour Protection
35 43 53.16 - Segmental Wall Scour Protection
35 43 53.40 - Stone Wall Scour Protection

Gallery

Featured Image 1
We are located in Shelby County.
Share URL copied!
https://www.thebluebook.com/iProView/11318/parrot-structural-services-llc/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.