JC Construction LLC

Share

Broussard, LA 70518

Company Info

  • Est. 2007
  • Size 20-49 Employees
  • Annual Vol Undisclosed

Featured Project Return to Projects List

Charenton Canal Facility – Phase I

Project Information

Project Location:
LA
Approx Contract:
$2,000,000
Status:
Completed
Structure Type:
Misc Project

References

Owner:
Gulf Craft
Architect:
Freyou, Moore & Associates

Scope Of Work

The New Shipyard Facility for Gulf Craft is situated on 40 acres on the Charenton Canal in Baldwin, LA. The project consists of constructing a new 56’ X 220’ boat slip with a sheet pile bulkhead, 3 building pads, site drainage, site electrical and mechanical. Included in the work was extensive pile driving operations, a 30’ concrete runway for a 300 ton boat crane, and a complex anchoring system to support the sheet piles. One of the challenges faced were not where the frequently occurring high tides which often resulted in the working area being inundated with water. To overcome the challenge of working below the water level required innovative and creative solutions.

Project Images

#
#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/1104977/jc-construction-llc/general-contractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.