South Liberty Parkway Phase II Design-build
Project Information
- Project Location:
- Liberty, MO
- Status:
- Completed
- Structure Type:
- Park / Playground
References
- Owner:
- City Of Liberty, MO
Scope Of Work
Emery Sapp & Sons were chosen as Design-Builder to construct a 4-lane arterial roadway , an instrumental infrastructure improvement to help drive economic corridor between east west Liberty, MO. South Liberty Parkway extended South Liberty Parkway from Withers Roads to Highway 291 passing through previously undeveloped real estate primarily to be used for farming . addition four-lane parkway opens to new residential developments. 2.5 miles new roadway also provides commuters with an alternative route to Highway 291. As Design-Builder, ESS was challenged to develop an early GMP to fast-track . ESS was also challenged to develop a proactive collaborative design that accommodated all stakeholders including adjacent landowners, Union Pacific Railroad (UPRR), Central Pacific Railway (CPRR), and BNSF Railway.
included clearing, erosion , earthwork, aggregate base, guard rail, fencing, street lighting, seeding, landscaping. Additionally, included two bridges one which utilized a girder launching technique. first bridge that spans over Union Pacific/Central Pacific railway was a 188′ two-span precast bridge with NU girders a 65′ wide deck. second was a 703′ six-span bridge with NU girders a 65′ wide deck over BNSF railway Little Shoal Creek. Overall included 750,000 cubic yards excavation grading, 80,285 square yards Type 5 base rock, 6,000 linear feet storm sewer, 36 storm sewer structures, 18,000 linear feet 16″ water line 5,000 linear feet 12″ water line. Furthermore, the includes a pedestrian path, 65,000 square yards 10″ asphalt pavement, 3,500 square yards 12″ MoDOT Superpave asphalt, two 12×12 concrete reinforced concrete boxes (RCB), 63,000 square feet sidewalks, two new traffic signals at Withers MO-291.