We poured 56,364 sq. ft. of flatwork.
We formed and poured out the gas pump pads,canopy and fuel tank heavy reinforced flatwork.
Set 50 outside bollards posts and poured in with the Dot Red band sidewalk with stone finish stamp texture.
3D finish graded out rest of driveways, parking area and 3D laser screed poured, finished 49,863 sq. ft.and sealed.
Project was a mid/late November project that was challenged by rain and freezing cold. Poured when possible and had to cover with concrete blankets.