Logo

Access Limited Construction Co.

Oceano, CA 93445

Company Info

  • Est. 1997

People Also View These
Loading...

Our Story

AIS Construction Company has been providing professional, cost-effective solutions to the marine and construction industry since 1995. AIS provides excavation and dredging services for projects having difficult access, particularly steep slopes and hard to reach areas. 

The staff of AIS professionals has over 100 years of combined dredging, engineering, and marine con- struction experience. Knowledge innovation, and cost effective solutions for difficult projects are what sets AIS apart. Customers receive the most competitive prices and the highest quality of service available. Over 80% of AIS' contracted work is due to referrals from a long list of satisfied customers. 

What We Do

Commercial Experience

Regions & Counties Serviced

  • California-Los Angeles and Vicinity

Alabama All

Alaska All

Arizona All

Arkansas All

California All

Colorado All

Connecticut All

Delaware All

District Of Columbia All

Florida All

Georgia All

Hawaii All

Idaho All

Illinois All

Indiana All

Iowa All

Kansas All

Kentucky All

Louisiana All

Maine All

Maryland All

Massachusetts All

Michigan All

Minnesota All

Mississippi All

Missouri All

Montana All

Nebraska All

Nevada All

New Hampshire All

New Jersey All

New Mexico All

New York All

North Carolina All

North Dakota All

Ohio All

Oklahoma All

Oregon All

Pennsylvania All

Puerto Rico All

Rhode Island All

South Carolina All

South Dakota All

Tennessee All

Texas All

Utah All

Vermont All

Virginia All

Washington All

West Virginia All

Wisconsin All

Wyoming All

Our CSI Codes

06 13 33 - Heavy Timber Pier Construction
31 24 13 - Roadway Embankments
31 24 16 - Railway Embankments
31 32 13 - Soil Mixing Stabilization
31 32 13.13 - Asphalt Soil Stabilization
31 32 13.16 - Cement Soil Stabilization
31 32 13.19 - Lime Soil Stabilization
31 32 13.23 - Fly-Ash Soil Stabilization
31 32 13.26 - Lime-Fly-Ash Soil Stabilization
31 32 16 - Chemical Treatment Soil Stabilization
31 32 16.13 - Polymer Emulsion Soil Stabilization
31 32 19 - Geosynthetic Soil Stabilization and Layer Separation
31 32 19.13 - Geogrid Soil Stabilization
31 32 19.16 - Geotextile Soil Stabilization
31 32 33 - Shotcrete Soil Slope Stabilization
31 33 23 - Rock Slope Netting
31 33 26 - Rock Slope Wire Mesh
31 33 43 - Vegetated Rock Slope Stabilization
31 35 19 - Geosynthetic Slope Protection
31 35 19.13 - Geogrid Slope Protection
31 35 19.16 - Geotextile Slope Protection
31 35 19.19 - Slope Protection with Mulch Control Netting
31 35 23 - Slope Protection with Slope Paving
31 35 23.13 - Cast-In-Place Concrete Slope Paving
31 35 26 - Containment Barriers
31 35 26.13 - Clay Containment Barriers
31 35 26.16 - Geomembrane Containment Barriers
31 35 26.23 - Bentonite Slurry Trench
31 63 19.13 - Rock Sockets for Piles
31 72 13 - Rock Reinforcement and Initial Support
31 77 13 - Trench Excavation for Submerged Tunnels
31 77 19 - Floating and Laying Submerged Tunnels
32 11 33 - Cement-Treated Base Courses
32 32 34 - Reinforced Soil Retaining Walls
32 91 16 - Planting Soil Stabilization
32 91 16.13 - Blanket Planting Soil Stabilization
32 91 16.16 - Mat Planting Soil Stabilization
32 91 16.19 - Netting Planting Soil Stabilization
33 01 30.52 - Pond and Reservoir Maintenance
35 01 30 - Operation and Maintenance of Coastal Construction
35 01 40 - Operation and Maintenance of Waterway Construction
35 01 40.92 - Preservation of Water Courses
35 01 50 - Operation and Maintenance of Marine Construction
35 01 50.71 - Channel Excavation, Cleaning and Deepening
35 05 30 - Common Work Results for Coastal Construction
35 05 40 - Common Work Results for Waterway Construction
35 05 50 - Common Work Results for Marine Construction
35 06 30 - Schedules for Coastal Construction
35 06 40 - Schedules for Waterway Construction
35 06 50 - Schedules for Marine Construction
35 12 33 - Marine Navigation Equipment
35 20 13.16 - Hydraulic Bulkheads
35 20 13.19 - Hydraulic Manifolds
35 20 13.23 - Hydraulic Penstocks
35 20 13.26 - Hydraulic Trashracks
35 20 16 - Hydraulic Gates
35 20 16.13 - Hydraulic Spillway Crest Gates
35 20 16.19 - Hydraulic Head Gates
35 20 16.26 - Hydraulic Sluice Gates
35 20 16.33 - Hydraulic Miter Gates
35 20 16.39 - Hydraulic Sector Gates
35 20 16.46 - Hydraulic Tainter Gates and Anchorages
35 20 16.53 - Hydraulic Vertical Lift Gates
35 20 16.59 - Hydraulic Closure Gates
35 20 23 - Dredging
35 20 23.13 - Mechanical Dredging
35 20 23.23 - Hydraulic Dredging
35 20 23.33 - Integrated Dredging and Dewatering
35 30 00.00.01 - Coastal Construction
35 31 16 - Seawalls
35 31 16.13 - Concrete Seawalls
35 31 16.19 - Steel Sheet Piling Seawalls
35 31 16.23 - Timber Seawalls
35 31 16.40 - Stone Seawalls
35 31 19 - Revetments
35 31 19.13 - Sacked Cement-Sand Revetments
35 31 19.16 - Concrete Unit Masonry Revetments
35 31 19.40 - Stone Revetments
35 31 23 - Breakwaters
35 31 23.13 - Rubble Mound Breakwaters
35 31 23.16 - Precast Breakwater Modules
35 31 26 - Jetties
35 31 26.13 - Concrete Jetties
35 31 26.16 - Concrete Unit Masonry Jetties
35 31 26.40 - Stone Jetties
35 31 29 - Groins
35 31 29.13 - Concrete Groins
35 31 29.16 - Concrete Unit Masonry Groins
35 31 29.26 - Steel Groins
35 32 13 - Scrap Material Artificial Reefs
35 32 13.13 - Scrap Concrete Artificial Reefs
35 32 13.33 - Sunken Ship Artificial Reefs
35 32 16 - Constructed Artificial Reefs
35 32 16.13 - Constructed Concrete Artificial Reefs
35 32 16.19 - Constructed Steel Artificial Reefs
35 40 00.00.01 - Waterway Construction and Equipment
35 41 13 - Landside Levee Berms
35 41 13.13 - Stability Landside Levee Berms
35 41 13.16 - Seepage Landside Levee Berms
35 42 35 - Slope Protection Bank Protection
35 42 37 - Riprap Bank Protection
35 42 53 - Wall Bank Protection
35 43 35 - Slope Protection Scour Protection
35 43 37 - Riprap Scour Protection
35 49 23 - Waterway Locks
35 49 23.13 - Concrete Waterway Locks
35 49 23.23 - Piling Waterway Locks
35 50 00.00.01 - Marine Construction and Equipment
35 51 13 - Floating Piers
35 51 13.23 - Floating Wood Piers
35 51 13.26 - Floating Plastic Piers
35 51 23 - Pontoons
35 52 13 - Fixed Offshore Platform Construction
35 52 33 - Floating Offshore Platform Construction
35 53 23 - Underwater Harbor Deepening
35 59 13 - Marine Fenders
35 59 13.16 - Resilient Foam-Filled Marine Fenders
35 59 13.19 - Rubber Marine Fenders
35 59 23 - Buoys
35 59 23.13 - Mooring Buoys
35 59 23.16 - Anchor Pendant Buoys
35 59 23.19 - Navigation Buoys
35 59 29 - Mooring Devices
35 59 29.16 - Laser Docking Systems
35 71 19 - Rockfill Gravity Dams
35 73 16 - Rock Embankment Dams
35 79 13 - Fish Ladders
35 79 13.13 - Concrete Fish Ladders

Project Experience

  • Prevailing Wages (Davis Bacon)
  • Public
  • Private
  • Projects From $200,000 to $10,000,000

Gallery

Associations & Memberships

AGC of Texas
AGC of Texas
AEG (Assn. of Environmental & Engineering Geologists)
AEG (Assn. of Environmental & Engineering Geologists)
HGS (Highway Geology Symposium)
HGS (Highway Geology Symposium)
AGC (Associated General Contractors)
AGC (Associated General Contractors)
CalGeo (California Geotechnical Engineering Assn.)
CalGeo (California Geotechnical Engineering Assn.)

Preferred Brands

Adler Tank Rentals
Adler Tank Rentals
Boulderscape
Boulderscape
Chama Valley Productions
Chama Valley Productions
Dywidag-Systems International
Dywidag-Systems International
Geobrugg
Geobrugg
Kaiser
Kaiser
Maccaferri
Maccaferri
Williams Form
Williams Form
Share URL copied!
https://www.thebluebook.com/iProView/259970/access-limited-construction-co/material-suppliers/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.