Pleasant Unity Supply, Inc.
Greensburg, PA 15601
Featured Project Return to Projects List
982 Bridge
Project Information
- Project Location:
- PA
- Status:
- Completed
- Structure Type:
- Bridge
Scope Of Work
For Donegal Construction to install a new culvert bridge the water needed to be diverted somehow, so a triple run of 48” ADS N-12 storm pipe was installed and 45 degree elbows were used to divert the water around the bridge to allow demolition and installation of the new precast culvert bridge. After bridge was complete the pipe was removed and saved to use on future projects.