Logo

County Materials Corp.

Madison, WI 53719

Featured Project Return to Projects List

County Materials Ups the Ante for Chicago Mile-Long Bridge Project

Project Information

Project Location:
Chicago, IL
Status:
Completed
Structure Type:
Bridge

References

Owner:
Illinois State Toll Highway Authority (ISTHA)
General Contractor:
F.H. Paschen

Scope Of Work

Products Used:

160-foot-long Prestressed Bridge Girders, Oversized 186.5-foot-long Prestressed Bridge Girders

Location:

Tri-State Corridor (I-294) Mile-Long Bridge Southwest of Chicago

in 2019, County Materials began production on the largest prestressed concrete bridge girders manufactured in the Midwest to date. These colossal girders measure 90 inches tall by 187 feet long  weigh a breathtaking 240,000 pounds. In total, County Materials manufactured 273 concrete girders of various sizes for the Illinois’ Mile-Long Bridge project. This essential corridor, that is traveled by 150,000 vehicles daily, is undergoing reconstruction to increase capacity for both the northbound  the southbound bridges. The new Mile-Long Bridge is expected to open for traffic in 2023.

Project Images

#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/981164/county-materials-corp/material-suppliers/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.