Logo

Bronner Construction

Share

Frankenmuth, MI 48734

Company Info

  • Est. 1883
  • Size 10-19 Employees
  • Annual Vol Undisclosed

Featured Project Return to Projects List

St. Lorenz Lutheran Church Steeple

Project Information

Project Location:
Frankenmuth, MI
Status:
Completed - Jan 1996
Structure Type:
Church / Synagogue

Scope Of Work

Due to a tornado damage was done to the roof and steeple.  The roof was lifted off the bearing wall and the steeple was leaning 15 inches off center at the elevation of the cross, with one side lifted 1.5 inches above its bearing point, causing the steeple to lean.

 

The roof was pulled back and tied back down and a scaffold was built around the tower.  Approximately 8,000 loose brick were replaced and the steeple pulled back to its original position by a series of turnbuckles and tiedowns.  The cornice at the base of the steeple was replaced as was the cross at its pinnacle.

Share URL copied!
https://www.thebluebook.com/iProView/957295/bronner-construction/general-contractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.