Logo

Straub Construction, Inc.

Share

Fallbrook, CA 92028

Company Info

  • Est. 1977
  • Size 50-99 Employees
  • Annual Vol Undisclosed

Featured Project Return to Projects List

C-130 Hangar & Administration Unit

Project Information

Project Location:
Long Beach, CA
Status:
Completed - Sep 2009
Structure Type:
Government

References

Owner:
US Army Corps of Engineers

Scope Of Work

Military Hangar/Maintenance Facility

New Construction

42,765 Total Square Feet

Completed Ahead of Schedule

Overall Cost Savings to the Owner

Zero Reportable Injuries/Lost Workdays

Sustainable Design Features Included

Self-Performed 20% of Scope

“Outstanding” Owner Evaluation

As the primary contractor, Straub Construction was charged with constructing a 29,009 SF pre-engineered metal Maintenance Hangar, a 13,756 SF Aircraft Maintenance unit, as well as a large administrative  which surrounds two sides of the hangar and ties into the existing taxiway.

The hangar/aircraft maintenance unit was built to prepare, service and maintain C-130 aircraft; supporting the beddown of the Combat Search and Rescue (CSAR) mission at Davis Monthan AFB and the activation of a C-130 squadron with 10 aircraft. The new facility improves readiness efforts and enables the CSAR squadron to be fully functional; filling a 28 year need.

Construction elements for the hangar include site improvements, utilities, landscaping and irrigation, roads, parking, split faced block, reinforced concrete foundation and floor slab, pre-engineered metal building components, standing seam metal roof, fire detection/ protection, special security enhancements, specialized heating and air conditioning with temperature and humidity limitations, and communications support.

Project Images

#
#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/943642/straub-construction-inc/general-contractors/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.