Logo

Flatiron West, Inc.

Benicia, CA 94510

Company Info

  • Est. 1947
  • Size 500+ Employees
  • Annual Vol Undisclosed

Featured Project Return to Projects List

San Diego International Airport - The Green Build at Terminal 2

Project Information

Project Location:
San Diego, CA
Status:
Completed
Structure Type:
Airport Runway

References

Owner:
San Diego County Regional Airport Authority
Architect:
General Contractor:
Flatiron

Scope Of Work

Flatiron used a fleet of volumetric mixers to batch and place rapid strength concrete for runway resurfacing and light can replacement at the San Diego International Airport. Each light can required less than a yard of concrete, but the concrete needed to adequately cure and be ready for traffic each morning. Flatiron replaced 188 center line light cans and 98 touchdown zone lights. Using a combination of volumetric mixers and rapid strength concrete, Flatiron safely returned the runway over for use on time each morning.

Share URL copied!
https://www.thebluebook.com/iProView/930185/flatiron-west-inc/subcontractors/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.