Logo

Flatiron West, Inc.

Benicia, CA 94510

Company Info

  • Est. 1947
  • Size 500+ Employees
  • Annual Vol Undisclosed

Featured Project Return to Projects List

Poplar Point Pumping Station Replacement

Project Information

Project Location:
Washington, DC
Approx Contract:
$50,000,000
Status:
Completed - Apr 2017
Structure Type:
Sewage / Water Treatment Plant

Scope Of Work

The Poplar Point (Division Z) project is one piece of the ongoing DC CSO (Clean Rivers) Project. Work includes construction of a new sewage pumping station to replace the existing Poplar Point station that was constructed in the early 1900s, as well as construction of a microtunnel diversion sewer, sewer overflow chamber, main outfall sewer diversion chamber, force main discharge connection chamber and a new microtunnel gravity sewer to serve the adjacent community.

Key project elements include:

Installation of 229 H-Piles to support future pump station

Installation 194 auger cast piles for support of diversion chambers

Installation of 800 linear feet of Microtunneling work of 72 inch and 42 inch diameter sewers

Installation of 1000 vertical linear feet of jet grout columns

Placement of 9,500 cubic yards of reinforced concrete

Installation of mechanical, electrical, plumbing, fire protection, and HVAC system for the future pump station

Installation of a green roof

Installation of structural steel for skeleton of the pump station

Perform temporary by-passing of existing sewer for new construction

Installation of support of excavation system and structural excavation

Installation of architectural precast panels

Share URL copied!
https://www.thebluebook.com/iProView/930185/flatiron-west-inc/subcontractors/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.