Logo

Flatiron West, Inc.

Benicia, CA 94510

Company Info

  • Est. 1947
  • Size 500+ Employees
  • Annual Vol Undisclosed

Featured Project Return to Projects List

Carquinez Suspension Bridge

Project Information

Project Location:
Crockett, CA
Status:
Completed - Oct 2004
Structure Type:
Bridge

Scope Of Work

The Carquinez Suspension Bridge carries traffic westbound on I-80 over the Carquinez Strait just north of San Francisco. Flatiron constructed a three-span 3,465-foot-long structure that became North America’s first suspension bridge of its kind to be built in 35 years. At bid time, it was the largest project ever awarded by the California Department of Transportation.

Each 407-foot-tall tower is supported by 12, three-meter-diameter and 90-meter-long rock-socketed drilled shaft piles. Reinforced concrete pile caps transfer vertical and lateral loads between the piles and the towers.

The suspended superstructure utilizes a steel orthotropic deck section 1,056 meters in length. The 24 deck sections were transported on three ocean-going vessels from Japan and jacked into place directly from the ship using the bridge’s main suspension cables. The bridge is designed to withstand both major wind and seismic disturbances.

Project Images

#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/930185/flatiron-west-inc/subcontractors/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.