West Chester University - Graham Natatorium

Project Information

Project Location:
PA
Status:
Completed - Sep 2014
Structure Type:
School / College / University

Scope Of Work

This fast paced construction project commenced July 2014. Work consisted of draining the 800,000 gallon pool, removal and replacement of the existing diatomaceous earth swimming pool filtration and carbon steel recirculation system, removing and replacing the concrete gutter system with a stainless steel system, and the installation of other miscellaneous equipment.  The Universities logo was installed in tile work in the center of the two swimming pools.

After the pool was drained, the first step was to remove via cutting out over 500 linear feet of a reinforced concrete gutter around the perimeter of the pools.  This was done for the installation of a new welded-in-place stainless steel gutter system. Next, the pool floor was prepared for tile repairs throughout the lap and competition pools along with new pool perimeter tile and logo work.  A new state of the art pressure regenerative filtration system was installed including a second surge tank in the mechanical space below the pool.  Other equipment installed included recirculation pumps, a UV system and all interconnecting piping.   The pool was ready for the 2014-2015 season in September 2014.

Project Images

#
#
Share URL copied!
https://www.thebluebook.com/iProView/901356/gem-mechanical-services/subcontractors/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.