Logo

Berneche2 Architecture P.C.

Glen Ellyn, IL 60137

Company Info

  • Est. 2006
  • Size 1-4 Employees
  • Annual Vol Not Provided

Featured Project Return to Projects List

Queen of All Saints Parish Addition

Project Information

Project Location:
Michigan City, IN
Approx Contract:
$4,000,000
Status:
In-Progress - Dec 2017
Structure Type:
Church / Synagogue

References

Owner:
Diocese of Gary
Architect:
Berneche2 Architecture
General Contractor:
Tonn and Blank Construction
Client:
Kevin Huber - Pastor
(219) 872-9196
Diocese of Gary

Scope Of Work

The parish pastor approached us to look at options to connect an existing Catholic Church and school together with a new addition. The project initially began with creating an addition to relocate four meeting rooms from a dilapidated annex building needing repairs.  It soon expanded to include relocation of a meditation chapel from under the school library, and to provide a suitable fellowship space/narthex for the church off the primary parking areas.  We looked at both one and two story options, and the building committee liked the efficiency of the two-story options.  Three pairs of stained glass windows in the church will be removed to create doors that encourage parishioners to exit the church into the gathering space to encourage fellowship after services.

A unique challenge was that the school building is a split-level building, so while the addition would be on the same level as the church floor, it would straddle between school floors.  A stair had to be designed to connect the various levels, and a two-sided elevator will provide the school with wheelchair access for the first time since its 1950 opening.

The initial Construction budget is $3.4M. 

Project Images

#
#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/870407/berneche2-architecture-p-c/architects/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.