The Boldt Co.

Share

Rochester, MN 55901

Home Contact Us

Company Info

  • Est. 1889
  • Size 500+ Employees
  • Annual Vol Undisclosed

Featured Project Return to Projects List

Wolverine Power Cooperative ~ Alpine Power Plant

Project Information

Project Location:
Elmira, MI
Status:
Completed
Structure Type:
Power Generation & Distribution

References

Architect:
Power Burns and Roe

Scope Of Work

Wolverine Power is building and will operate a 2x0 Simple Cycle 405 MW project at a green-field site located in the Elmira Township in Otsego County, Michigan. Wolverine has awarded two Combustion Turbine Generators (GTGs) to the General Electric Company. The combustion turbines will be natural gas fired GE Frame 7FA.05. The generators are hydrogen cooled. The two generator step-up transformers for the project were awarded to Hyundai Transformer USA. All other engineered equipment will be purchased by the owner and supplied to the project site. The project is scheduled for completion in July 2016.

Boldt’s role on the project as the general contractor includes installation of the concrete substructures, equipment installations, structural steel and equipment enclosures. Boldt will also self-perform the piping installations.  Electrical, instrumentation and insulation installations are included in the Boldt scope and will be provided by key subcontractors.

Share URL copied!
https://www.thebluebook.com/iProView/847390/the-boldt-co/general-contractors/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.