Logo

Guardian Environmental Services Co.

Share

Newark, DE 19702

Company Info

  • Est. 1987
  • Size 100-249 Employees
  • Annual Vol Undisclosed

Featured Project Return to Projects List

Bee-Line Oil Spill

Project Information

Project Location:
Port Murray, NJ
Approx Contract:
$50,000,000
Status:
Completed
Structure Type:
Misc Project

Scope Of Work

Fuel oil at the Bee-Line site had been leaking from onsite storage tanks into the Musconetcong River, a navigable waterway of the US, in Mansfield Township, Warren County, NJ. GES has been tasked with providing the manpower and equipment necessary to drain #2 fuel oil from above ground oil storage tanks, associated pipeline and appurtenances. GES also had to deploy and maintain oil spill booms and sorbent materials as necessary. GES is improving and maintaining an existing interceptor trench and expanding this trench system as directed by the USEPA’s on site coordinator. From this trench GES must pump collected #2 fuel oil and stage in containers for disposal. GES installed isolating structures around contaminated shoreline and excavated oil contaminated soil to prevent future seepage into the river. GES responsibly disposed of all contaminated materials and backfilled quarry processed stone.

Project Images

#
#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/818132/guardian-environmental-services-co/general-contractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.