602 MADISON ST

Project Information

Project Location:
HOBOKEN, NJ
Status:
In-Progress - Jul 2024
Structure Type:
Misc Project

References

Architect:
JAMES S. MCNEIGHT ARCHITECT PLANNER PC
General Contractor:
CHILLEMI CONSTRUCTION GROUP

Scope Of Work

POWERWALL STUCCO SYSTEM INSTALLATION

  1. Complete installation of ½” hard coat stucco system on the back of the building, exterior bulkhead, and two sides of the building.
  2. Complete installation of gold coat waterproofing.
  3. Complete installation of 1” rigid insulation
  4. Complete installation of 2 layers of felt paper.
  5. Complete installation of drain mat.
  6. Complete installation of galvanized 2.5 wire lath
  7. Complete installation of “J” channels and expansion joints required to break big walls into small panels easy to work with.
  8. Complete installation of Powerwall scratch coat.
  9. Complete installation of Powerwall hard coat.
  10. The complete application of Powerwall stucco finish will be the final coat.
  11. Complete installation of backer rod and caulking to all windows where the stucco will be installed only.

 

CMU INSTALLATION

  1. Complete installation of 8”x8”x16” CMU walls at ground floor only.
  2. Complete installation of 6”x8”x16” CMU walls at ground floor only and elevator doors enclosure.
  3. Complete installation of galvanized durowal every 2nd course of CMU as per specs (A-4).
  4. Complete installation of #4 vertical rebar @32” O.C. as per specs (A-4).
  5. Fill block solid with concrete @rebar as per specs (A-4).

 

BRICK INSTALLATION (LABOR ONLY)

  1. Complete installation of gold coat waterproofing.
  2. Complete installation of 1-1/2” rigid insulation.
  3. Complete installation of mortar net at first courses of brick.
  4. Complete installation of weepholes and flashing at steel lintels.
  5. Complete installation of galvanized brick ties @24” both ways.
  6. Complete installation of standard brick as per elevation (LABOR ONLY).
  7. Complete installation of galvanized loose lintels and relief angles @every floor.
  8. Complete installation of backer rod and caulking to all windows where the brick will be installed only.
  9. Wash brick after installation.

Project Images

#
#
#
#
#
#
#
#
#
#
#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/813380/vp-masonry-drywall-llc/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.