Featured Project

522 MONROE ST

Project Location:
HOBOKEN, NJ
Completion:
Nov 2019

References

Owner:
522-528 MONROE ST. LLC
Architect:
MARCHETTO HIGGINS STIEVE
General Contractor:
T&M CONTRACTING

Scope Of Work

STO CI STUCCO SYSTEM INSTALLATION

  1. Complete installation of STO CI Stucco System As per Specs.
  2. Complete installation of emerald coat water proofing.
  3. Complete installation of Dow rigid insulation 2”.
  4. Complete installation of two layers felt paper #15.
  5. Complete installation of STO drain screen 48”.
  6. Complete installation of “J” channels and CI weep track and drip edge aluminum flashing at all windows.
  7. Complete installation of expansion joints required to break big walls into small panels easy to work with.
  8. Complete installation of wire lath 2.5
  9. Complete installation of Powerwall scratch coat.
  10. Complete installation of Powerwall hard coat.
  11. Complete application of primer coat.
  12. Complete application of Powerwall stucco finish will be final coat.
  13. Complete application of backer rod and caulking to all windows.

NEW BRICK VENEER AND STONE INSTALLATION

  1. Installation of new brick as per specs.
  2. Installation of wall ties.
  3. Installation of flashing tape.
  4. Installation of weep holes.
  5. Installation of mortar net.
  6. Installation of cast stone as per specs.
  7. Brick washing.
  8. Complete application of backer rod and caulking to all windows where the brick was installed.