Featured Project

374-380 COMMUNIPAW AVE

Project Location:
JERSEY CITY, NJ
Completion:
Oct 2021

References

Architect:
MVMK MINERVINI VANDERMARK MELIA KELLY ARCHITECTURE DESIGN
General Contractor:
SIXBORO CONSTRUCTION LLC

Scope Of Work

8” CMU BLOCK WALL INSTALLATION

  1. To install 8”x8”x16” CMU block at first floor, staircases and elevator shaft as per specs.
  2. To install dur-o-wall wire every 2 (two) courses of CMU as per specs.
  3. To install #5 rebar every 32” o.c.  as per specs.
  4. To fill block cells every 32” as per specs.

 

POWERWALL STUCCO SYSTEM

  1. Complete installation of two layers of felt paper #15.
  2. Complete installation of control joints and plaster stops “j” channels.
  3. Expansion joints will be required to break big walls into small panels for easy to work with.
  4. Complete installation of wire lath mesh.
  5. Complete installation of scratch coat as first layer.
  6. Complete installation of hard coat as second layer.
  7. Complete application of Powerwall stucco will be the third and final coat.

 

NEW BRICK VENEER INSTALLATION

AND REPOINTING

  1. Complete installation of VP160 BLUESKIN waterproofing under the brick areas only.
  2. To power wash existing brick.
  3. To clean and repoint existing brick at front facade of the building.
  4. Installation of new brick as per specs at front façade and west side of the building.
  5. Installation of 1-1/2” rigid insulation.
  6. Installation of wall ties.
  7. Installation of flashing tape.
  8. Installation of weep holes.
  9. Installation of mortar net.
  10. Installation of cast stone as per specs.
  11. Brick washing.
  12. Complete application of backer rod and caulking to all windows where the brick will be installed.

 

TO POUR CONCRETE

  1. To brake existing concrete.
  2. To disposal the waste.
  3. To install wire reinforcing mesh.
  4. To install asphalt expansion control joints.
  5. To forming and pouring new sidewalk and curb concrete as per specs.

Project Images

#
#
#
#
#
#
#
#
#
#
#