United Wall Systems, Inc.

Winter Garden, FL 34787

Company Info

  • Est. 2008
  • Annual Vol $1 million - $3 million

Featured Project Return to Projects List

Burton Snowboards

Project Information

Project Location:
Orlando, FL
Approx Contract:
$71,000
Status:
Completed - Nov 2008
Structure Type:
Retail Store

References

Owner:
Burton
Architect:
Ibarra Collaborative International
General Contractor:
Friedrich Watkins Company
Client:
John Jarrell
(407) 952-0307
Friedrich Watkins Company

Scope Of Work

 

05400-Cold Formed Metal Framing
  • 6” 20 gage metal stud framing at new 1 HR demising wall, stockroom wall, and fitting room ceilings
  • 3-5/8” 20 gage metal stud framing for all other walls, ceilings, and soffits
  • 7/8” 25 gage DWC on metal stud framing at fitting room ceilings
  • Misc clips and fasteners
 
06100-Rough Carpentry
  • ¾” FT plywood fitting room benches
  • 2x FT wood framing for benches
  • 2x FT blocking for toilet accessories
 
07210-Building Insulation
  • R-11 unfaced sound batts at wall between Sales and Stock Room and at new demising wall
 
09250-Gypsum Board
  • Drywall (5/8” Type X, typical)
  • Drywall finishing (Level 4 at exposed areas, Level 1 at concealed)
  • Patch drywall at new water fountains
  • Beads and trims
 
09510-Acoustical ceilings
  • 2x2 Armstrong Fissured #755 square edge tile in Prelude 15/16” grid, white
 
 
 
 
 
 
EXCLUSIONS:
  • Performance and Payment bonds. Add 1.5 percent if required.
  • Temporary power, water and lighting. GC to provide this at no cost to United Wall Systems
  • Temperature and/or humidity controls. GC to provide this at no cost to United Wall Systems
  • Firecaulking, sleaving, or sealing of MEP penetrations, new or existing
  • Wood blocking or backing wood or metal
  • Wood nailers
  • Premium or shift time except as noted herein
  • Primer and/or paint
  • Mold and/or air pollutant insurance coverage
  • Exposed caulking
  • Work at existing walls not specifically included above
 
CLARIFICATIONS:
  • All metal stud framing is at 16” o.c.
  • Where walls are exposed, drywall extends to deck above. No drywall above ceilings at restroom, office and closet.
  • Deck height assumed at 22’ at highest point.
Share URL copied!
https://www.thebluebook.com/iProView/807/united-wall-systems-inc/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.