17th St Vault - Demolition
Project Information
- Project Location:
- Washington, DC
- Approx Contract:
- $70,000
- Status:
- Completed - Sep 2017
- Structure Type:
- Bank
References
- Owner:
- Liberty 1100 17th St, LP
- Architect:
- OTJ Architects
- General Contractor:
- HBW Construction
- Client:
- Andre Chin Wing - Project Manager HBW Construction
Scope Of Work
Removed and disposed of safety deposit boxes and related equipment inside vault.
Sawcut where necessary to separate vault from building structure to remain.
Demolished vault structure using 480V Brokk 180 Demolition Robot.
Removed 7,500 lb vault door utilizing industry standard methods.
Removed 1” thick steel plate liner inside vault
Installed and removed protection in lobby area each shift.
Utilized Micro-trap Hepa filters and mist sprayers for dust control during demolition activities.
We are looking forward to working with Andre on future projects with HBW!