Logo

Veteran Pipeline Construction (VPC)

Orange, CA 92865

Company Info

  • Est. 2006
  • Size 250-499 Employees
  • Annual Vol Undisclosed

Featured Project Return to Projects List

Rocky Canyon Road

Project Information

Project Location:
Atascadero, CA
Status:
Completed
Structure Type:
Utilities

Scope Of Work

In a rugged and rocky area south of downtown Atascardero, a leak was detected in a high pressure gas transmission line located on privately owned land. SoCalGas determined horizontal directional drilling (HDD) would be the best method for installation of a  steel pipeline to minimize environmental impact, reduce restoration costs, and cause the least disruption for homeowners. Because it was considered a high level risk due to the potential hazard  an exposed transmission line and close proximity to a waterway, ABD worked quickly to engineer a plan and begin boring. The project was initiated and completed in two weeks.

Project Images

#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/804107/veteran-pipeline-construction-vpc/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.