Scope Of Work
This project consisted of the removal and replacement of existing concrete equipment pads on the rooftop of the WWTP due to the need to replace the electrical components that rested on top of each pad. MK Concrete completed the project in two phases so that the facility could remain operational. Each new pad was 400 SF and MK Concrete handled the demo of each existing 4” concrete pad and the installation of the new 6” concrete pads.