Company Info

  • Est. 2004
  • Size 20-49 Employees
  • Annual Vol Undisclosed
  • DUNS # 178950668

Featured Project Return to Projects List

Henry Avocado Corporation / Lincoln Processing Facility

Project Information

Project Location:
Escondido, CA
Status:
Completed - Feb 2016
Structure Type:
Storage Facility / Warehouse

References

General Contractor:
Cool-Roof Systems
Client:
Henry Avocado Corporation

Scope Of Work

Size of Project: 28,300 square feet

Type of Project: Foam Roofing to a metal roof deck

Specification: 2.7lb Foam Sprayed at 1.5”. Elastomeric Coating System installed over foam @ 1.5 gallons per 100 square feet

Assignment: Repair and recoat 10,600 sq. ft. of existing foam roof.  Install a spray foam roofing system over 17,700 sq. ft. metal roof. Provide owner with a 10-year leak free warranty that includes labor and material for the full term.  

Solution: Cool-Roof Systems installed 1.5” of sprayed polyurethane foam to approximately 17,700 square feet of a metal roof deck. Due to expansion and contraction of the existing metal roof, spray foam was installed to properly seal and insulate the warehouse and office area. The roof has a current 10-year leak free warranty.

Share URL copied!
https://www.thebluebook.com/iProView/796652/cool-roof-systems/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.