Company Info

  • Est. 1948
  • Size 100-249 Employees
  • Annual Vol $20 million - $50 million

Featured Project Return to Projects List

CHOLLAS CREEK QUAYWALL FUEL TANK PROJECT (NAVAL BASE SAN DIEGO)

Project Information

Project Location:
San Diego, CA
Status:
Completed - Jan 2018
Structure Type:
Military

References

Owner:
COMNAVREG SW Port Operations
General Contractor:
Menco Pacific, Inc.

Scope Of Work

Project Description

This design-and-build marina fuel facility project included installation of a 10,000-gallon, two-compartment, aboveground storage tank and double-wall piping systems onto a floating dock for gasoline and diesel fuel dispensing into small-craft vessels. We adhered to the Department of Defense’s Unified Facilities Criteria and the requirements of the California Air Resource Board for phase-I enhanced vapor recovery for aboveground tanks.

Scope of Work

  • Design & Build
  • Aboveground Storage Tank
  • Fuel Dispensing Systems
  • Electrical

Services Provided

  • Design & Engineering
  • Permitting 
  • Demolition/Removal/Disposal 
  • Excavation & Trenching 
  • Piping System Installation
  • Class I Division I & II Electrical
  • Monitoring System
  • Compliance Testing
  • Inspections
  • Project Close-out

Notable Accomplishment

The most significant challenge during this project was designing the piping systems to accommodate for tidal fluctuations (minus 4 ft to plus 8 ft). This was accomplished through collaboration and teamwork with the piping system manufacturer, OmegaFlex. More specifically, we had them custom design piping systems and cradles to hold the double-wall dock connectors in a safe manner during the rise and fall of the tides.

Share URL copied!
https://www.thebluebook.com/iProView/767397/western-pump-inc/subcontractors/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.